Facilities

The MOBC, Grand Harbour Installation is situated at Grand Harbour, Spencer Hill, Marsa and consists of the following:-

–                Office Buildings

–                Tank Farm of 12 above ground storage tanks

–                Pump House and boiler room

–                Access to loading jetting with pipelines at DWQ and Flagstone Wharf

–                Truck Loading gantry

The Terminal has a total capacity of 46,030cubic meters which include FO storage of 41,960mts and GO storage of  4,070mts.

TANK NO. CAPACITY CBM CONST. DATE
PRODUCT
1 2050 1996 FO
2 950 1996 FO
3 2600 1964 FO
4 9800 1964 FO
5 4600 1996 GO
6 10800 1996 FO
7 10800 1996 FO
8 50 2002 GO
9 360 2002 FO
10 550 2003 GO
11 2270 2003 GO
12 1200 2003 GO

The Grand Harbour Installation has also heating, pumping and blending facilities for delivery of all types of Fuels including Thin Fuel Oils and Gas Oils.

The terminal is equipped with a fire protection system.  All tanks are equipped with a fixed water installation for the cooling of tanks.  This system is supplied by fire pumps via steel pipelines drawing sea water directly from Flagstone Wharf.

Safety Advice for the Community